"id": 8907,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "Changement de politique de gouvernement/ Remise en cause de l’objectif de l’accès universel à l’eau potable en 2021\nNon-respect par le Gouvernement des règles de bonne gouvernance qu’il a lui-même adoptées \nPerte de confiance/collaboration entre les 3 ONGs de mise en œuvre\nChangement dans la composition des équipes des 3 ONGs\nFaible sensibilité des acteurs GIRE au genre et à la prise en compte des jeunes \nPeu d’importance accordée à la représentativité des acteurs au sein des organes à mettre en place",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7743
},
{
"id": 8940,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "1. Risk - Delay in the approval of the integration policy by the house of representatives \nMigitation - Given the current favourable political economy situation of the country internally and externally (with neighbouring countries). This is most likely to go through but if this doesn’t happen or is delayed then it will affect the implementation of the programme. If delayed, we can still go on with internships which is possible. Exception maybe be granted for some refugee in collaboration with Netherlands Embassy to facilitate special permission from ARRA.\n2. Risk - Delay in importation of the machinery for the bucket manufacturing plant.\nMitigation : High support Tulip Addis to start the planning and importation process as soon as the agreement signed so that there is enough time. \n3. Risk - Government priority or strategy with regard to job compact lacking sector specific direction or policy.\t\nMitigation: This is to state that what the government have signed and agreed on job compact may not reach ground level and may not have directives for various sectors. That may hinder immediate action but this can be worked out through various means like close collaboration with ARRA.\n4 . Risk - The programme will have components that is not directly delivered by itself rather by private or government bodies. This means that impact is considered influenced and in some cases limited.\t\nMitigation : The pilot phase has to be careful while selecting partners to work with. \n5. Risk - Due to high risk of secondary migration Private sector may not be willing to offer fixed term employment for refugees integrated.\nMitigation : The selection of the refugees willing to join work force will be carefully selected with the support of the refugee community representative. With pilot practice and demonstration, private firm view will change. \n6. RISK - Tulip Addis pull out from the program \nMitigation: Tulip Addis has good track record with SNV IAP program. The due diligence done confirmed that the company is a well reputable with good financial standing to deliver the assignment. Plus there will be a close monitoring and support to ensure implementation according the agreement.",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7760
},
{
"id": 9046,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8015
},
{
"id": 9180,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8760
},
{
"id": 9187,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8761
},
{
"id": 9215,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8804
},
{
"id": 9222,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8805
},
{
"id": 9236,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8807
},
{
"id": 9243,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8808
},
{
"id": 9250,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8809
},
{
"id": 9264,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 8815
},
{
"id": 34012,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 9012
},
{
"id": 34026,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "L'engagement du ministère de la santé et celui de l'Enseignement Supérieur et de la Recherche Scientifique, pour disponibiliser les factures de loyer et de personnel.\nRéechelonnement et Reintegration des nouveaux formés dans la fonction publique",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 9022
},
{
"id": 58591,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "Si les ménages ont plus d'argent et si des aliments nutritifs sont plus disponibles, leur accès à la nourriture augmentera.",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 9418
},
{
"id": 66932,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 9677
},
{
"id": 67082,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or still required? Challenges faced during reporting year Institutional aspects in Kenya: environmental influence, market failures, investment climate, etc \r\n",
"value": "",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 10128
},
{
"id": 275,
"name": "Risks/Assumptions",
"section": 5,
"max_characters": null,
"help_text": "What risks (foreseen and unforeseen) have affected the realisation of the project. What social risks exist and how do these affect women, men, and youth differently? What mitigation actions have been taken in the reporting year? Support received and/or sti (...)",
"value": "As was foreseen in the KMHP Workplan 2017, with 2017 being an election year in Kenya, the risk of political unrest (risks 12 & 13 in the risk matrix) proved to be higher than in non-election years. Implementation of activites were hampered in and in general, economic activities slowed down during the whole of 2017 due to the political incertainty. Further, the risk of access to finance (risk 9 in the matrix) already stated in the Workplan as well, was confirmed again by the November Mid-Term Review (MTR) of KMHP. Although already initiatives have been undertaken in 2017 to mitigate this risk (starting dialogue with financial sector actors and development of initiatives for innovative finance solution (eg. meetings with Equity Bank and support to proposal on Agri-Wallet with Dodore to the Mastercard Foundation), more will need to be done to address these issues in a systemic way. In some of the business cases/regions also the drought had a negative effect on the results, as well as bad quality inputs (case of non-germination of canola seeds provided to farmers by Syngenta through Agventure). In general another risk is that changes in gender relations as well as adoption of more environmentally friendly practices proof to take a longer time than the span of the program.",
"mandatory": false,
"order": 1,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 2602
},
{
"id": 2448,
"name": "Results and activities",
"section": 1,
"max_characters": 0,
"help_text": "What is your assessment of the results of the Action so far? Include observations on the performance and the achievement of outputs, outcomes and impact and whether the Action has had any unforeseen positive or negative results.\r\nReferring to the final updated logframe matrix, please comment the level of achievement of all the results on the basis of the corresponding current value of the indicators and all the related activities implemented during the reporting period.\r\nOutcome 1 (Oc) – \"Title of Outcome\"\r\nComment on final status of indicators associated to Oc and explain any changes, especially any underperformance; refer to the indicators and assumptions in the Logframe:\r\nOutput 1.1. (Op 1.1.) – \"Title of Output 1.1. \"\r\n(…)\r\nFollowing the above assessment of results, please elaborate on all the topics/activities covered.\r\n",
"value": "",
"mandatory": false,
"order": 2,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 5751
},
{
"id": 2958,
"name": "Results and activities",
"section": 1,
"max_characters": 0,
"help_text": "What is your assessment of the results of the Action so far? Include observations on the performance and the achievement of outputs, outcomes and impact and whether the Action has had any unforeseen positive or negative results.\r\nReferring to the final updated logframe matrix, please comment the level of achievement of all the results on the basis of the corresponding current value of the indicators and all the related activities implemented during the reporting period.\r\nOutcome 1 (Oc) – \"Title of Outcome\"\r\nComment on final status of indicators associated to Oc and explain any changes, especially any underperformance; refer to the indicators and assumptions in the Logframe:\r\nOutput 1.1. (Op 1.1.) – \"Title of Output 1.1. \"\r\n(…)\r\nFollowing the above assessment of results, please elaborate on all the topics/activities covered.\r\n",
"value": "",
"mandatory": false,
"order": 2,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 6194
},
{
"id": 8558,
"name": "Results and activities",
"section": 1,
"max_characters": 0,
"help_text": "What is your assessment of the results of the Action so far? Include observations on the performance and the achievement of outputs, outcomes and impact and whether the Action has had any unforeseen positive or negative results.\r\nReferring to the final updated logframe matrix, please comment the level of achievement of all the results on the basis of the corresponding current value of the indicators and all the related activities implemented during the reporting period.\r\nOutcome 1 (Oc) – \"Title of Outcome\"\r\nComment on final status of indicators associated to Oc and explain any changes, especially any underperformance; refer to the indicators and assumptions in the Logframe:\r\nOutput 1.1. (Op 1.1.) – \"Title of Output 1.1. \"\r\n(…)\r\nFollowing the above assessment of results, please elaborate on all the topics/activities covered.\r\n",
"value": "",
"mandatory": false,
"order": 2,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7605
},
{
"id": 8648,
"name": "Results and activities",
"section": 1,
"max_characters": 0,
"help_text": "What is your assessment of the results of the Action so far? Include observations on the performance and the achievement of outputs, outcomes and impact and whether the Action has had any unforeseen positive or negative results.\r\nReferring to the final updated logframe matrix, please comment the level of achievement of all the results on the basis of the corresponding current value of the indicators and all the related activities implemented during the reporting period.\r\nOutcome 1 (Oc) – \"Title of Outcome\"\r\nComment on final status of indicators associated to Oc and explain any changes, especially any underperformance; refer to the indicators and assumptions in the Logframe:\r\nOutput 1.1. (Op 1.1.) – \"Title of Output 1.1. \"\r\n(…)\r\nFollowing the above assessment of results, please elaborate on all the topics/activities covered.\r\n",
"value": "",
"mandatory": false,
"order": 2,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7618
},
{
"id": 8768,
"name": "Results and activities",
"section": 1,
"max_characters": 0,
"help_text": "What is your assessment of the results of the Action so far? Include observations on the performance and the achievement of outputs, outcomes and impact and whether the Action has had any unforeseen positive or negative results.\r\nReferring to the final updated logframe matrix, please comment the level of achievement of all the results on the basis of the corresponding current value of the indicators and all the related activities implemented during the reporting period.\r\nOutcome 1 (Oc) – \"Title of Outcome\"\r\nComment on final status of indicators associated to Oc and explain any changes, especially any underperformance; refer to the indicators and assumptions in the Logframe:\r\nOutput 1.1. (Op 1.1.) – \"Title of Output 1.1. \"\r\n(…)\r\nFollowing the above assessment of results, please elaborate on all the topics/activities covered.\r\n",
"value": "(1) Improve access to quality learning opportunities for 75,000 children (6-18 year olds) in safe and protective environments in the four states;\n\n(2) Improve the nutrition status of 75,000 primary learners in the four targeted areas with daily school meals for 24 months.",
"mandatory": false,
"order": 2,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7644
},
{
"id": 8783,
"name": "Results and activities",
"section": 1,
"max_characters": 0,
"help_text": "What is your assessment of the results of the Action so far? Include observations on the performance and the achievement of outputs, outcomes and impact and whether the Action has had any unforeseen positive or negative results.\r\nReferring to the final updated logframe matrix, please comment the level of achievement of all the results on the basis of the corresponding current value of the indicators and all the related activities implemented during the reporting period.\r\nOutcome 1 (Oc) – \"Title of Outcome\"\r\nComment on final status of indicators associated to Oc and explain any changes, especially any underperformance; refer to the indicators and assumptions in the Logframe:\r\nOutput 1.1. (Op 1.1.) – \"Title of Output 1.1. \"\r\n(…)\r\nFollowing the above assessment of results, please elaborate on all the topics/activities covered.\r\n",
"value": "(1) Improve access to quality learning opportunities for 75,000 children (6-18 year olds) in safe and protective environments in the four states;\n\n(2) Improve the nutrition status of 75,000 primary learners in the four targeted areas with daily school meals for 24 months.",
"mandatory": false,
"order": 2,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7645
},
{
"id": 8798,
"name": "Results and activities",
"section": 1,
"max_characters": 0,
"help_text": "What is your assessment of the results of the Action so far? Include observations on the performance and the achievement of outputs, outcomes and impact and whether the Action has had any unforeseen positive or negative results.\r\nReferring to the final updated logframe matrix, please comment the level of achievement of all the results on the basis of the corresponding current value of the indicators and all the related activities implemented during the reporting period.\r\nOutcome 1 (Oc) – \"Title of Outcome\"\r\nComment on final status of indicators associated to Oc and explain any changes, especially any underperformance; refer to the indicators and assumptions in the Logframe:\r\nOutput 1.1. (Op 1.1.) – \"Title of Output 1.1. \"\r\n(…)\r\nFollowing the above assessment of results, please elaborate on all the topics/activities covered.\r\n",
"value": "",
"mandatory": false,
"order": 2,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7646
},
{
"id": 2452,
"name": "Learning from the action",
"section": 1,
"max_characters": 0,
"help_text": "What has your organisation or any actor involved in the Action learned from the Action and how has this learning been utilised and disseminated?",
"value": "",
"mandatory": false,
"order": 6,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 5751
},
{
"id": 2962,
"name": "Learning from the action",
"section": 1,
"max_characters": 0,
"help_text": "What has your organisation or any actor involved in the Action learned from the Action and how has this learning been utilised and disseminated?",
"value": "",
"mandatory": false,
"order": 6,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 6194
},
{
"id": 8562,
"name": "Learning from the action",
"section": 1,
"max_characters": 0,
"help_text": "What has your organisation or any actor involved in the Action learned from the Action and how has this learning been utilised and disseminated?",
"value": "",
"mandatory": false,
"order": 6,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7605
},
{
"id": 8652,
"name": "Learning from the action",
"section": 1,
"max_characters": 0,
"help_text": "What has your organisation or any actor involved in the Action learned from the Action and how has this learning been utilised and disseminated?",
"value": "",
"mandatory": false,
"order": 6,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7618
},
{
"id": 8772,
"name": "Learning from the action",
"section": 1,
"max_characters": 0,
"help_text": "What has your organisation or any actor involved in the Action learned from the Action and how has this learning been utilised and disseminated?",
"value": "",
"mandatory": false,
"order": 6,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7644
},
{
"id": 8787,
"name": "Learning from the action",
"section": 1,
"max_characters": 0,
"help_text": "What has your organisation or any actor involved in the Action learned from the Action and how has this learning been utilised and disseminated?",
"value": "",
"mandatory": false,
"order": 6,
"type": "text",
"dropdown_options": null,
"dropdown_selection": null,
"project": 7645
}
]
}