<iati-activities xmlns:akvo="http://akvo.org/iati-activities" version="2.03" generated-datetime="2025-01-17T12:29:08">
  <iati-activity last-updated-datetime="2023-03-30T08:41:44+02:00" xml:lang="en" default-currency="EUR">
    <iati-identifier>NL-KVK-24428291</iati-identifier>
    <reporting-org ref="NL-KVK-34200988-PMS-154" secondary-reporter="0" type="22">
      <narrative>Acacia Water</narrative>
    </reporting-org>
    <title>
      <narrative>3R Jordan - Acacia Water</narrative>
    </title>
    <description type="1" akvo:type="4">
      <narrative>Design and implementation of rainwater harvesting 3Rs practices and policy dialogue in Jordan</narrative>
    </description>
    <description type="1" akvo:type="5">
      <narrative>This project is dedicated to the integration of water harvesting as an integrated water management and climate adaptation intervention in Jordan&#8217;s resiliency efforts. The project is driven by the scoping study funded by the Netherlands Embassy in Amman (reference). Following the clear recommendations of the scoping study, the project was developed to cover both technical and policy making levels. Further it also includes capacity building and participatory approach as core themes in the scope of work. Our consortium and experts present the case and methodology for instituting water harvesting with complementing policy and capacity building action, as a sustainable approach for enhancing the resilience of communities and ecosystems most vulnerable to the impacts of climate change and population growth in Jordan. The methodology adopted in this work plan preparation includes the following: 

Literature review of water harvesting related reports, papers, data an online resources; 

- &#183; Consortium meetings and brainstorming sessions; 
- &#183; Field visit to success and failure stories of 3R in Jordan; 
- &#183; Field visits to potential water harvesting sites; 
- &#183; Consultation session with more than 40 stakeholders representing government, private sector, academia, NGOs, local communities and others.</narrative>
    </description>
    <participating-org ref="JO-COA-0301-57112" type="23" role="1">
      <narrative>Inter-Islamic Network on Water Resources Development and Management</narrative>
    </participating-org>
    <participating-org ref="NL-KVK-34200988-PMS-154" type="22" role="2">
      <narrative>Acacia Water</narrative>
    </participating-org>
    <participating-org ref="NL-KVK-34200988-PMS-154" type="22" role="4">
      <narrative>Acacia Water</narrative>
    </participating-org>
    <other-identifier ref="10655" type="B9">
      <owner-org ref="NL-KVK-27327087">
        <narrative>Akvo Foundation</narrative>
      </owner-org>
    </other-identifier>
    <activity-status code="2"/>
    <activity-date iso-date="2022-01-01" type="1"/>
    <activity-date iso-date="2022-01-01" type="2"/>
    <activity-date iso-date="2024-12-31" type="3"/>
    <contact-info type="2">
      <organisation>
        <narrative>Acaciia Water</narrative>
      </organisation>
      <person-name>
        <narrative>Tine te Winkel</narrative>
      </person-name>
      <job-title>
        <narrative>Project Manager</narrative>
      </job-title>
      <email>tine.tewinkel@acaciawater.com</email>
      <mailing-address>
        <narrative>van Hogendorpplein 4, 2805 BM Gouda</narrative>
      </mailing-address>
    </contact-info>
    <recipient-country code="JO" percentage="100.0"/>
    <location>
      <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
        <pos>31.9539494 35.910635</pos>
      </point>
    </location>
    <sector code="14015" vocabulary="1" percentage="100.0"/>
    <policy-marker code="1" significance="1" vocabulary="1"/>
    <policy-marker code="3" significance="2" vocabulary="1"/>
    <policy-marker code="10" significance="2" vocabulary="1"/>
    <policy-marker code="2" significance="1" vocabulary="1"/>
    <default-flow-type code="10"/>
    <default-finance-type code="110"/>
    <default-aid-type code="C01" vocabulary="1"/>
    <default-tied-status code="5"/>
    <budget>
      <period-start iso-date="2022-01-01"/>
      <period-end iso-date="2022-12-31"/>
      <value value-date="2022-01-01" akvo:label="Total">250200.00</value>
    </budget>
    <budget>
      <period-start iso-date="2023-01-01"/>
      <period-end iso-date="2023-12-31"/>
      <value value-date="2023-01-01" akvo:label="Total">333600.00</value>
    </budget>
    <budget>
      <period-start iso-date="2024-01-01"/>
      <period-end iso-date="2024-12-31"/>
      <value value-date="2024-01-01" akvo:label="Total">208500.00</value>
    </budget>
    <budget>
      <period-start iso-date="2025-01-01"/>
      <period-end iso-date="2025-02-01"/>
      <value value-date="2025-01-01" akvo:label="Total">41700.00</value>
    </budget>
    <transaction>
      <transaction-type code="1"/>
      <transaction-date iso-date="2022-01-01"/>
      <value value-date="2022-01-01">250200.00</value>
      <description>
        <narrative>first installment</narrative>
      </description>
      <provider-org provider-activity-id="JO-COA-0301-57112-4000005402" ref="JO-COA-0301-57112" type="23">
        <narrative>Inter-Islamic Network on Water Resources Development and Management</narrative>
      </provider-org>
      <receiver-org receiver-activity-id="NL-KVK-24428291-4000005402" ref="NL-KVK-34200988-PMS-154" type="22">
        <narrative>Acacia Water</narrative>
      </receiver-org>
    </transaction>
    <transaction>
      <transaction-type code="1"/>
      <transaction-date iso-date="2023-01-01"/>
      <value value-date="2023-01-01">333600.00</value>
      <description>
        <narrative>2nd installment</narrative>
      </description>
      <provider-org provider-activity-id="JO-COA-0301-57112-4000005402" ref="JO-COA-0301-57112" type="23">
        <narrative>Inter-Islamic Network on Water Resources Development and Management</narrative>
      </provider-org>
      <receiver-org receiver-activity-id="NL-KVK-24428291-4000005402" type="70">
        <narrative>Acacia Water B.V.</narrative>
      </receiver-org>
    </transaction>
    <transaction>
      <transaction-type code="11"/>
      <transaction-date iso-date="2022-01-01"/>
      <value value-date="2022-01-01">834000.00</value>
      <provider-org provider-activity-id="JO-COA-0301-57112-4000005402" ref="JO-COA-0301-57112" type="23">
        <narrative>Inter-Islamic Network on Water Resources Development and Management</narrative>
      </provider-org>
      <receiver-org receiver-activity-id="NL-KVK-24428291-4000005402" ref="NL-KVK-34200988-PMS-154" type="22">
        <narrative>Acacia Water</narrative>
      </receiver-org>
    </transaction>
    <transaction>
      <transaction-type code="4"/>
      <transaction-date iso-date="2022-12-31"/>
      <value value-date="2022-12-31">291838.00</value>
      <description>
        <narrative>Expenditures year 1</narrative>
      </description>
      <provider-org provider-activity-id="NL-KVK-24428291-4000005402" ref="NL-KVK-34200988-PMS-154" type="22">
        <narrative>Acacia Water</narrative>
      </provider-org>
    </transaction>
    <document-link url="https://storage.googleapis.com/akvo-rsr-production-media-files/db/project/10655/2022-09-20_10-48-40.JPG" format="image/jpeg">
      <title>
        <narrative>Acacia Water, 2022, credit: Umm el Jimal</narrative>
      </title>
      <category code="A12"/>
    </document-link>
    <related-activity ref="JO-COA-0301-57112-4000005402" type="1"/>
    <conditions attached="0"/>
    <result type="1">
      <title>
        <narrative>C1: 3R interventions have been analyzed according to their socio-economic and environmental impact</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>A socio-economic impact assessment has been conducted</narrative>
        </title>
        <baseline year="2022" value="0%"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>An environmental impact assessment has been conducted</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="0.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1" aggregation-status="1">
      <title>
        <narrative>C1: Youth and women are involved and empowered as much as possible during 3R implementation</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of community members actively participating in the project intervention (disaggregated by women and youth)</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="500"/>
          <actual value="500.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="500"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="500"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C1: Policies on water resource use and water harvesting are developed and recommended</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>An action plan for ministerial departments is developed</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="10.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="2">
      <title>
        <narrative>C1:   A long term 3R action plan for sustainable implementation in Jordan is available</narrative>
      </title>
      <indicator measure="5" ascending="1">
        <title>
          <narrative>The long term strategy is accepted by the ministry of water and irrigation</narrative>
        </title>
        <baseline year="2022"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target/>
          <actual value="Will be reported on in the next reporting period."/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target/>
          <actual/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target/>
          <actual/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C1: A nationally supported long-term action plan for 3R implementation in Jordan and guidelines that make this technically possible are in place</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>A long term action plan for ministrial governmental implementation is created in coordination with stakeholders</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="20.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C1: Existing national and international strategies, policies and laws concerning water and water harvesting are analysed.</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>A document with lessons learned existing national and international strategies, policies and laws concerning water and water harvesting is developed</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="0.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C1: All stakeholders are analyzed and consulted and there input it used for the national dialogue and the feasibility &amp; implementation phase of the 3R interventions</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>Stakeholders are mapped to support the stakeholder consultation and guidelines</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="80.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of consultation sessions held as input for the national dialogue and the feasibility and implementation phase of the 3R interventions</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="40"/>
          <actual value="40.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="40"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="40"/>
          <actual value="0"/>
        </period>
      </indicator>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of stakeholders that provided input for the national dialogue and the feasibility and implementation phase of the 3R interventions</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="300"/>
          <actual value="600.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="0"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="0"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C1:  Existing strategies, policies and capacities are analyzed</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>An analysis of existing, policies and capacities is completed</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C1: The national dialogue on RWH is executed by means of 6 national workshops</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of national workshops held on national dialogue RWH</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="6"/>
          <actual value="4.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="6"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="6"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: The scoping study results are evaluated and validated and the performed mapping is interpretated;</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>Evaluation and validation of the scoping study results and interpretation of performed mapping completed</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="100.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: Knowledge and data gaps regarding design parameters are identified through performing a literature review on 3R and rainwater harvesting in Jordan</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>Literature review on 3R and rainwater harvesting in Jordan is completed</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: A hydrological, biophysical baseline and database are in place</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of baseline studies completed</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="3"/>
          <actual value="6.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="3"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="3"/>
          <actual value="0"/>
        </period>
      </indicator>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Project database available and in-situ complete</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="100.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: A better understanding of suitable locations for 3R interventions through the development of a so-called  &#8216;3R Potential Map for Mafraq, Azraq Basin and North Jordan Valley</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>A report on suitable locations fro 3R interventions is available</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="0.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: Hydrogeological, socio-economic baseline and 3R maps are ground truthed and validated</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>A baseline report is developed with lessons learned and ground truthed and validated 3R maps</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="100.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: Sustainable, repeatable and innovative 3R structures suited to the Jordan&#8217;s water resources context are identified</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>Criteria for selection of 3R and rainwater harvesting measures are defined.</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: A combined GIS database containing relevant remote sensing and hydrogeological data available for the four project areas</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of regions with remote sensing and hydrological data in the combined GIS database</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="3"/>
          <actual value="9.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="3"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="3"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: 3R potential maps and simple hydrological models are developed for Azraq, Mafraq, Wadi Madoneh and North Jordan Valley.</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>Criteria for selection of 3R and rainwater harvesting measures are defined.</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: An integrated impact assessment is conducted based on which the first 3 sites are selected in Azraq, Mafraq and NJV</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>An impact assessment is conducted, reported and processed in conceptual designs.</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: Design parameters are developed based on validation and testing of the first 3 intervention sites.</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>Design parameters developed based on validation by fieldwork activities</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: Conceptual designs are developed per specific intervention type</narrative>
      </title>
      <indicator measure="2" ascending="1">
        <title>
          <narrative>Conceptual designs are developed per specific intervention type</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="100"/>
          <actual value="50.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="100"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="2">
      <title>
        <narrative>C2: Different 3R techniques are showcased, tested, and evaluated at various pilot locations and upscaling opportunities assessed</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Establishment of demonstration sites to exhibit 3R and Nature-Based Solutions methodology</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="1"/>
          <actual value="2.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="1"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="1"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="2">
      <title>
        <narrative>C2: Women and youth are supported to setup economically and environmentally sustainable Home-Based Businesses (HBB) using 3R techniques;Soil erosion of agri-businesses reduced, and sustainability enhanced</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of HBB utilizing Rain water harvesting, establishing communitiy-based agricultural cluster with market linkage assistance established</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="20"/>
          <actual value="40.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="20"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="20"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: 3R interventions and water harvesting structures are implemented in Azraq, Mafraq, Wadi Madoneh and North Jordan Valley (NJV)</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of 3R interventions including installation of sensors for monitoring reports</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="42"/>
          <actual value="2.00"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="42"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="42"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="1">
      <title>
        <narrative>C2: Monitoring wells installed</narrative>
      </title>
      <indicator measure="1" ascending="1">
        <title>
          <narrative>Number of monitoring wells installed</narrative>
        </title>
        <baseline year="2022" value="0"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target value="3"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target value="3"/>
          <actual value="0"/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target value="3"/>
          <actual value="0"/>
        </period>
      </indicator>
    </result>
    <result type="2">
      <title>
        <narrative>Enhanced positive public awareness and acceptance around  RWH, particularly water harvesting practices</narrative>
      </title>
      <indicator measure="5" ascending="1">
        <title>
          <narrative>Extent of increased awareness and acceptance around RWH</narrative>
        </title>
        <baseline year="2022"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target/>
          <actual value="This will be reported on in the next reporting period."/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target/>
          <actual/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target/>
          <actual/>
        </period>
      </indicator>
    </result>
    <result type="2">
      <title>
        <narrative>Enhanced water citizenship</narrative>
      </title>
      <indicator measure="5" ascending="1">
        <title>
          <narrative>The extent to which water citizenship has been enhanced</narrative>
        </title>
        <baseline year="2022"/>
        <period>
          <period-start iso-date="2022-01-01"/>
          <period-end iso-date="2022-12-31"/>
          <target/>
          <actual value="Will be reported on in the next reporting period"/>
        </period>
        <period>
          <period-start iso-date="2023-01-01"/>
          <period-end iso-date="2023-12-31"/>
          <target/>
          <actual/>
        </period>
        <period>
          <period-start iso-date="2024-01-01"/>
          <period-end iso-date="2024-12-31"/>
          <target/>
          <actual/>
        </period>
      </indicator>
    </result>
  </iati-activity>
</iati-activities>
